CSH-Knowledge Commitment Flexibility

 
Education Projects

Stocksbridge High School – high performance acoustics

Stocksbridge High School in Sheffield is part of the Sheffield Building Schools for the Future (BSF) programme and CSH Interiors we required to carry out the suspended ceilings and drylining work for their new hall and drama department which required high levels of acoustic performance.

Read full case study

Wintringham Oasis Academy – acoustic wood veneer ceilings and walls

Another Oasis Academy, this time in Grimsby, we installed a variety of suspended ceilings (mainly Ecophon Gedina) and completed areas of acoustic treatments to ceilings and walls.

Read full case study

Immingham Oasis Academy – specialist acoustic ceilings

Immingham Oasis Academy is one of the many Oasis Academies being built across the UK. We completed the suspended ceilings on this project, most of which were high specification Ecophon grid and tiles including Gedina A and Focus D along with some Master A.

Read full case study

Brumby Engineering College BSF project

Brumby Engineering College is part of Building Schools for the Future (BSF) programme. North Lincolnshire Council has secured £90m to rebuild and modernise secondary schools in Scunthorpe.

Read full case study

accred constructionlineaccred epicaccred cscsaccred omegaaccred chasaccred ais