PROJECT: Immingham Oasis Academy
MAIN CONTRACTOR: GB Building Solutions Ltd
PROJECT VALUE: £220,000

Immingham Oasis Academy is one of the many Oasis Academies being built across the UK. We completed the suspended ceilings on this project, most of which were high specification Ecophon grid and tiles including Gedina A and Focus D along with some Master A.

Of particular interest on this project are areas where we installed specialist acoustic ceilings to achieve both sound absorption and reverberation.

They were installed to exacting dimensions at various angles, the whole design having been thoroughly investigated down to the last hole which was machined into birch faced plywood. The overall appearance is quite striking.

An innovative aspect of works on this project was the design and installation of two elliptical feature ceilings. To add to the complexity these were to be built under a sloping glass soffit and were required to be conical as can be seen from the photographs. They were completed with a very high standard of workmanship; the curve sections are free of any flat spots or bumps and the skimming of the finished work is exceptional.

The surrounding layin grid for this area was Armstrong Orcal Microperf.

Latest News

  • Chesterfield College, Main Entrance
    CSH Interiors are pleased to announce they have been appointed to install the suspended ceilings, partitions and steel framing system at Chesterfield College with a contract value of £140,000.00.  Andrew…
read more...

Recent Projects

accred constructionlineaccred epicaccred cscsaccred omegaaccred chasaccred ais